BBAU 2025 house build discussion

Status
Not open for further replies.
I PRAY BBAU does not use background music and musical montages. Also very distracting. I don’t feel like a fly on the wall.
Seven's use of music was particularly annoying and unnecessary. Although watching the marathons, Ten used them for packaged montages at times, which is fine, but using music for dramatic purposes during usual house activities and conversations etc... just NO. Absolutely not.
 
Seven's use of music was particularly annoying and unnecessary. Although watching the marathons, Ten used them for packaged montages at times, which is fine, but using music for dramatic purposes during usual house activities and conversations etc... just NO. Absolutely not.
Yup, exactly what I was referring to. The UK has been doing it since the switch. Too bubble-gum-pop-esque. The general reality of the day-to-day highlight shows does not need underlying mood music. Packages with music shown in live episodes is a different thing. One thing 10 did, particularly during season 6, was have that ominous tone and mood lighting for nominations. It's just too much.

Needless to say, in keeping with the general topic of this thread, I hope the house isn't over the top.
 
True, well it could be a mid week finale then? 🤷🏻‍♂️ I just drove past Dreamworld and I couldn't see much 😭
Things looked better when that scenery painter job ad went up til 16th December.
 
I just drove past this again, it looks quite dirty and couldn't see anything except the normal industrial lights along the roof.

1000053380.jpg

So maybe they haven't started construction on it yet, or that isn't going to be the stage 🤔
 
I just drove past this again, it looks quite dirty and couldn't see anything except the normal industrial lights along the roof.

View attachment 66799

So maybe they haven't started construction on it yet, or that isn't going to be the stage 🤔
Based on that, and the fact that no construction has been reported in the old car park (now the dirt lot), that "amphitheater" is the only logical spot for live evictions. No other area makes sense. Even then, it apparently has support posts everywhere which would be a nightmare for any sort of filming or tv production.

However, with a month to go, I would've expected some sightings of construction activity there. The facilities to the east of the exhibition centre seem to make the most sense for production and gallery housing.
 
Based on that, and the fact that no construction has been reported in the old car park (now the dirt lot), that "amphitheater" is the only logical spot for live evictions. No other area makes sense. Even then, it apparently has support posts everywhere which would be a nightmare for any sort of filming or tv production.

However, with a month to go, I would've expected some sightings of construction activity there. The facilities to the east of the exhibition centre seem to make the most sense for production and gallery housing.
That's not to say there wasn't anything happening at floor level 👀

It's just from what I could see, there wasn't anything different to what I saw about 3 or so months ago from the same viewpoint.
 
I mean…. The coaster can be open for a day? It’s not going to impact the finale IMO….
Surely they would not want hundreds of people screaming throughout the final day or two's footage?
 
I mean as soon as I saw the hallway a few days ago I thought it’s giving itv but I didn’t want to judge too quick
 
Status
Not open for further replies.
Back
Top